缓存调制波熔铝炉烘炉的方法
缓存调制波熔铝炉在使用前必须烘炉,对于刚砌好炉衬的缓存调制波熔铝炉,应在不低于10~15℃的空气中自然干燥2~3天再进行通电烘炉。
烘炉工艺如下(详见坩埚保养工艺):
A、室温升到100℃,加热电流15A,空埚不加盖升温至100℃,恒温2h;
B、100℃升到200℃,加热电流20A,空埚不加盖升温至200℃,恒温2h;
C、200℃升到300℃,加热电流30A,空埚不加盖升温至300℃,恒温1h;
D、300℃升到800℃,满负荷升温,空埚加盖升温至800℃,恒温1h;
缓存调制波熔铝炉长期搁置再使用时,亦应按上述规定进行烘炉。
Method of buffering modulating wave melting aluminum furnace
The buffer modulated wave aluminum melting furnace must be baked before use. For the buffer modulated wave aluminum melting furnace that has just been lined, it should be naturally dried in the air at not less than 10-15°C for 2 to 3 days before being energized.
The oven process is as follows (see crucible maintenance process for details):
A. The room temperature rises to 100°C, the heating current is 15A, the empty pot is heated to 100°C without a lid, and the temperature is constant for 2h;
B. Raise the temperature from 100℃ to 200℃, the heating current is 20A, the empty pot is heated to 200℃ without a lid, and the temperature is constant for 2h;
C. Raise 200℃ to 300℃, heating current 30A, the empty crucible is heated to 300℃ without lid, constant temperature for 1h;
D. Raise the temperature from 300°C to 800°C, heat up at full load, cover the empty crucible and heat up to 800°C, keep the temperature constant for 1h;
When the buffer modulated wave aluminum melting furnace is put aside for a long time and then used again, the furnace should also be baked in accordance with the above regulations.