设为首页 设为收藏

联系方式

 

洛阳松导感应加热科技有限公司 

联系方式:15038554363  

24小时技术热线:15038554363

邮 箱:1390003299@qq.com

厂址:河南省洛阳市洛新工业园区

  • 产品
  • 1吨塞棒底注式中频电炉

    真空感应蒸馏提纯炉

    铝基中间合金熔炼炉

    水资源配置工程管道内防腐设备

    中频铝熔化炉

    中频熔铝炉

    1吨钢壳磁轭感应熔化中频炉

    小型中频炉

    迷你中频炉

    0.5T中频熔化炉

    5T中频炉新节能型

    3T中频炉新节能型

    500kg中频炉2022新节能型

    250kg中频炉新节能型

    1T中频炉2022新节能型

    2T中频炉2022节能型

    中频炉2022节能型

    水资源配置工程防腐设备

    4.8米钢管内防腐设备

    智能控制5吨中频炉

    智能控制1吨中频炉

    3吨中频炉2022新型

    2021新型中频炉

    2021新型钢壳中频炉

    1T中频炉

    0.5T并联中频炉

    2T中频感应炉

    0.25T并联中频炉

    中频电炉维修
    分享到:
        本文为技术资料或者文章来自网络,仅供参考学习,如涉嫌侵权,请告知删除
        

     

     

     

    中频炉逆变电路不能启动或启动困难的维修(英文版)

    ault phenomenon of induction melting furnace

    The inverter circuit of the IF power supply cannot be started or started up.

    Fault analysis and processing

    The main reason why the inverter circuit of the IF power supply cannot be started or started is as follows.

        (1) Short circuit between induction coils. If the induction coil does not cool well for a long time, the insulation is broken and a short circuit between turns is caused. Conductive materials such as dust and scale on the induction coil can also cause short-circuit between turns. When the intermediate frequency power supply is started, the ignition phenomenon occurs, and frequent ignition may cause the induction coil to break down. In this case, the surface of the induction coil should be cleaned, brushed with insulating paint or asbestos board.

        (2) The induction coil is short-circuited to the arc furnace casing. The induction coil housing is loose and there is too much ash in the furnace; the induction coil is discharged through the furnace base. In this case, the induction coil should be reinforced to remove dust.

        (3) The copper busbar connected to the induction coil at the intermediate frequency output is short-circuited. If there is a foreign object or the copper is not fixed, it may cause a short circuit between the copper rows.

        (4) The capacitor case is short-circuited to the ground. At this time, it should be checked whether there is water leakage, whether the capacitor base is too dusty, and whether the ceramic base of the capacitor is missing.

        (5) The water-cooled cable is disconnected, and the copper bus that is output to the load is blown.

        (6) Check if the current transformer insulation is damaged; remove the current transformer to check whether the insulation is good; use a multimeter to measure whether the coil is blown, and check if the wiring sequence is correct. If both are normal, check whether the potentiometer of the current signal adjustment is too small. The amplitude of the output current signal should be re-adjusted.

    (7) Check if the inverter circuit's inverter angle is too small. If it is too small, adjust the inverter angle; if it is normal, check if the current polarity is reversed. If not, check the inverter thyristor for a trigger pulse. If it is normal, check the inverter thyristor for damage. If it is damaged, replace it with a thyristor of the same type and specification.