铸造铁水浇铸的十大注意事项!
铸造厂使用中频炉熔化铸铁。中频炉主要用于冶炼碳钢、合金钢、特种钢,也可用于铜、铝等有色金属的冶炼和升温。该设备体积小、重量轻、效率高、电耗低、熔化和加热速度快。温度容易控制,生产效率高。
1.清除通道和场地内的所有障碍物。
2、检查钢包是否干燥,钢包底部、耳、杠杆、把手是否安全可靠,转动部分是否灵活。禁止使用未干的钢包。
3、所有与铁水接触的工具在使用前必须预热至500℃以上,否则不得使用。到
4、铁水不得超过铁水包体积的80%,搬运时必须缓慢、一致,防止铁水飞溅伤人。
5、用吊车吊起铁水前,应检查吊钩、链条是否可靠。吊链时不允许打结。铁水包有专人负责跟踪,路线上不得有人。
6、严格执行六不倒:
(1)铁水温度不够不浇;
(2)铁水品位有误或未浇;
(3)不堵渣,不倒料;
(4)砂箱既不干也不倒;
(5)不放外门,不倒水;
(6)铁水不够时不要倒。
7、铸件必须准确、稳定,不允许从冒口往砂箱中倒入铁水,观察铁水。
8、铁水倒入砂型时,要随时点燃从汽孔、冒口、箱缝排出的废气,以免有毒气体和铁水飞溅伤人。
9、剩余的铁水应倒入准备好的铁模或砂坑中。不得倒在沙堆和地面上,以防铁水爆炸伤人。因走火或其他原因在地面上流动的铁水,在凝固前不得用沙子覆盖,凝固后应及时清除。
10、所有设备使用前应检查安全可靠,使用后清理干净。
Top Ten Points for Attention in Casting Hot Metal in Foundry!
The foundry uses an induction melting furnace to melt cast iron. The induction melting furnace is mainly used for smelting carbon steel, alloy steel, special steel, and can also be used for smelting and raising temperature of non-ferrous metals such as copper and aluminum. The equipment is small in size, light in weight, high in efficiency, low in power consumption, and fast in melting and heating. The temperature is easy to control, and the production efficiency is high.
1. Clear all obstacles in the passage and venue.
2. Check whether the ladle is dried, whether the bottom of the ladle, ears, levers, and handles are safe and reliable, and whether the rotating part is flexible. It is forbidden to use undried ladle.
3. All tools in contact with molten iron must be preheated to above 500°C before use, otherwise they are not allowed to be used. To
4. The molten iron should not exceed 80% of the volume of the molten iron ladle, and the ladle must be carried slowly and in a consistent pace to prevent the molten iron from splashing and hurting people.
5. Before lifting the molten iron by a crane, check whether the hooks and chains are reliable. The chains are not allowed to be knotted during lifting. Special personnel should be responsible for following the molten iron ladle, and there should be no people on the route.
6. Strictly implement the six no-pouring:
(1) The temperature of the molten iron is not enough to not pour;
(2) The grade of the molten iron is wrong or not poured;
(3) Do not block the slag and do not pour;
(4) The sand box is neither dry nor poured;
(5) Do not put the outer gate and do not pour;
(6) Do not pour the molten iron if it is not enough.
7. The casting must be accurate and stable, and it is not allowed to pour molten iron into the sand box from the riser and watch the molten iron.
8. When molten iron is poured into the sand mold, it is necessary to ignite the exhaust gas discharged from the steam hole, riser and box seam at any time to avoid poisonous gas and molten iron splashing and hurting people.
9. The remaining molten iron should be poured into the prepared iron mold or sand pit. It is not allowed to pour on the sand pile and the ground to prevent the molten iron from exploding and hurting people. The molten iron flowing on the ground due to fire running or other reasons shall not be covered with sand before it is solidified, and should be removed in time after solidification.
10. All equipment should be checked for safety and reliability before use, and cleaned up after use.
https://songdaokeji.cn/category/products/induction-melting-furnace
firstfurnace@gmil.com
https://songdaokeji.cn/category/blog/induction-melting-furnace-related-information
firstfurnace@gmil.com
Telephone:8618037961302