购买感应熔化炉用户需要自备的项目
1.高压供电条件:包括高压开关柜、电力变压器及线缆;
2.低压供电条件:包括低压配电柜(屏)及线缆;
3.中频电源柜输出到电容器组架母排;
4.电容器组架到水冷电缆接头处槽路母排;
5.感应熔化炉用冷却水循环水池
1)不加水淋塔时:不小于lOOm3,深度1. 5-2m;
2)加水淋塔时:根据水淋塔热交换能力而定,每小时换热量大约需1 5万大卡;
6.水泵:建议采用双泵双电机,水泵扬程≥30m,流量≥300升/分钟;(20M3/h)
7.进水主管道:口径≥3英寸,分水管路为1. 5-2.5英寸;
8.回水主管道:口径≥4英寸,介水管路为2. 5-3英寸;
水系统参考供方水系统图实施
9.基建土建:接供方基础条件图实施;
10.炉衬材料:一般为石英砂质材料,见供方使用说明书;
Purchase of induction melting furnace users need to bring their own projects
1. High-voltage power supply conditions: including high-voltage switchgear, power transformers and cables;
2. Low-voltage power supply conditions: including low-voltage power distribution cabinets (screens) and cables;
3. The IF power cabinet is output to the capacitor bank busbar;
4. a capacitor bank rack to a channel busbar at a water-cooled cable joint;
5. Cooling water circulation pool for induction melting furnace
1) when not adding water tower: not less than l00m3, depth 1. 5-2m;
2) When adding water tower: According to the heat exchange capacity of the water tower, the heat exchange capacity per hour is about 150,000 kcal;
6. Water pump: It is recommended to use double pump and double motor, pump head ≥30m, flow rate ≥300L/min; (20M3/h)
7. The main water inlet pipe: caliber ≥ 3 inches, the water distribution pipeline is 1. 5-2.5 inches;
8. The backwater main pipe: caliber ≥ 4 inches, the water conduit is 2. 5-3 inches;
Water system reference supplier water system diagram implementation
9. Infrastructure construction: the implementation of the basic conditions of the supplier;
10. Furnace lining material: generally quartz sand material, see supplier's instruction manual;