设为首页 设为收藏

联系方式

 

洛阳松导感应加热科技有限公司 

联系方式:15038554363  

24小时技术热线:15038554363

邮 箱:1390003299@qq.com

厂址:河南省洛阳市洛新工业园区

  • 产品
  • 梯形铝锭在线提温设备

    0.2T中频定点浇注炉

    钢坯加热炉

    超高温烧结炉

    钢管在线加热及保温装置

    40KW感应加热取暖炉

    氮化硼专用中频加热线圈

    电机端环焊接设备

    电机转子导条焊机设备

    5吨中频炉熔化铸铁

    底出水熔铝炉

    侧下出水中频炉

    0.2吨铜雾化定点浇注炉

    3吨中频炉熔化铸钢件

    3吨中频炉熔化废铝

    3吨中频炉2500kw熔化铸铁

    1吨中频炉熔化铸铁件专用炉

    1吨12脉一拖二中频炉

    2吨中频炉用熔化铸钢件

    铸铁件1吨中频炉

    2吨铸造中频炉

    铸造1吨中频炉

    1.5吨钢壳液压中频炉

    1.5吨钢壳液压定点浇注炉

    3吨串联逆变中频炉

    圆钢感应加热炉

    铝棒感应加热炉

    方钢感应加热炉

    技术资料
    分享到:
        本文为技术资料或者文章来自网络,仅供参考学习,如涉嫌侵权,请告知删除
        

    购买感应熔化炉用户需要自备项目

      1.高压供电条件:包括高压开关柜、电力变压器及线缆;

      2.低压供电条件:包括低压配电柜(屏)及线缆;

      3.中频电源柜输出到电容器组架母排;

      4.电容器组架到水冷电缆接头处槽路母排;

      5感应熔化炉用冷却水循环水池

        1)不加水淋塔时:不小于lOOm3,深度1. 5-2m;

        2)加水淋塔时:根据水淋塔热交换能力而定,每小时换热量大约需1 5万大卡;

      6.水泵:建议采用双泵双电机,水泵扬程≥30m,流量≥300升/分钟;(20M3/h)

      7.进水主管道:口径≥3英寸,分水管路为1. 5-2.5英寸;

      8.回水主管道:口径≥4英寸,介水管路为2. 5-3英寸;

        水系统参考供方水系统图实施

      9.基建土建:接供方基础条件图实施;

      10.炉衬材料:一般为石英砂质材料,见供方使用说明书;

    Purchase of induction melting furnace users need to bring their own projects

      1. High-voltage power supply conditions: including high-voltage switchgear, power transformers and cables;

     2. Low-voltage power supply conditions: including low-voltage power distribution cabinets (screens) and cables;

      3. The IF power cabinet is output to the capacitor bank busbar;

      4. a capacitor bank rack to a channel busbar at a water-cooled cable joint;

      5. Cooling water circulation pool for induction melting furnace

       1) when not adding water tower: not less than l00m3, depth 1. 5-2m;

      2) When adding water tower: According to the heat exchange capacity of the water tower, the heat exchange capacity per hour is about 150,000 kcal;

     6. Water pump: It is recommended to use double pump and double motor, pump head 30m, flow rate 300L/min; (20M3/h)

     7. The main water inlet pipe: caliber 3 inches, the water distribution pipeline is 1. 5-2.5 inches;

     8. The backwater main pipe: caliber 4 inches, the water conduit is 2. 5-3 inches;

         Water system reference supplier water system diagram implementation

     9. Infrastructure construction: the implementation of the basic conditions of the supplier;

     10. Furnace lining material: generally quartz sand material, see supplier's instruction manual;