设为首页 设为收藏

联系方式

 

洛阳松导感应加热科技有限公司 

联系方式:15038554363  

24小时技术热线:15038554363

邮 箱:1390003299@qq.com

厂址:河南省洛阳市洛新工业园区

  • 产品
  • 小型中频炉

    迷你中频炉

    0.5T中频熔化炉

    5T中频炉新节能型

    3T中频炉新节能型

    500kg中频炉2022新节能型

    250kg中频炉新节能型

    1T中频炉2022新节能型

    2T中频炉2022节能型

    中频炉2022节能型

    水资源配置工程防腐设备

    4.8米钢管内防腐设备

    智能控制5吨中频炉

    智能控制1吨中频炉

    3吨中频炉2022新型

    2021新型中频炉

    2021新型钢壳中频炉

    1T中频炉

    0.5T并联中频炉

    2T中频感应炉

    0.25T并联中频炉

    0.5T中频炉

    0.5T并联中频炉

    0.5T串联中频炉

    0.5T 中频熔炉

    0.25T中频熔炉

    1T中频熔炉

    2T中频熔炉

    电炉行业动态新闻
    分享到:
        本文为技术资料或者文章来自网络,仅供参考学习,如涉嫌侵权,请告知删除
        

    Melting furnace inspection steps before leaving the factory

     1. In order to verify the quality of the contract equipment and related equipment during the production period, the tenderee has the right to send the person to the factory where the winning bidder is located for inspection. For the transportation expenses at the location of the winning bidder and for the quality inspection requirements of the bidder, such as necessary safety equipment, office supplies, technical documents and drawings, accounting data, manufacturing and inspection standards and other necessary inspection data shall be free of charge by the winning bidder. provide.

    2. The written materials formed by all the supervisors and quality inspection activities of the tenderer during the manufacturing period shall not be used as the quality certification documents of the successful bidder. Before the delivery, the quality inspection of the tenderer shall not remove the responsibility of the contract within the scope of the supplier's quality guarantee period, nor shall it replace the quality inspection of the equipment at the tenderee's site.

    3 . In the mid-inspection, the issues discovered or raised by members of the quality inspection team shall be resolved through friendly consultations.

    4. The equipment must be tested in the overall joint test before leaving the factory. The time for the inspection of the tenderee shall be determined according to the trial operation time. The joint trial operation shall be carried out under the supervision of the inspector of the tenderee.

    5. If there is a problem in the assembly test after the equipment arrives at the bidder's site, the reason is that the winning bidder did not perform the overall joint commissioning of the equipment before leaving the factory, so the delay time will be calculated according to the delayed delivery date.

     http://www.firstfurnace.com/BdwlkjNews.asp?id=1408


    Copyright© 2007-2013洛阳松导感应加热科技有限公司 All Rights Reserved 
    手 机:15038554363
    网站正在制作中,随时修改,非正式运行。
    本站关键词:中频炉、中频电炉、熔炼炉